Abila Technical
rider
For any inquiries, please contact our technical director
Chris DUPLECH - Phone : 00 33 ( 0 ) 6 14 68 54 34 -
e-mail: C.D.Z@wanadoo.fr
COMPOSITION OF COMPANY
7 persons (5 dancers, 1 Lighting Designer, 1 Video Artist)
COSTUME, DECOR AND TECHNICAL MATERIAL
To be supplied by the company
- Video Equipment:
1 case of 80cm x 70cm x 20cm, weighing 35 Kgs
1 case of 60cm x 40cm x 20cm, weighing
15 Kgs
- Decor: Gourds (8 boxes of 47cm x 47cm x 47cm each.
Weight: 8 Kgs per box)
INSTALLATION
Everything should be installed,
cabled and gelled before our arrival.
At the arrival
the technical and artistic team of the company, the presenting structure should
organise :
TECHNICAL SET
UP & REHEARSALS. (Day Before)
Local staff
to be made available by presenting structure:
8 hrs (4hr x 2)
- 1 Stage Manager
- 1 LightingTechnician
- 1 Assistant stage manager
- 1 Sound Technician
- 2 Electricians
PERFORMANCE
Local staff required 4 hours (before and during performance):
- 1 Stage Manager
- 1 LightingTechnician
- 1 Sound Technician
- 1 Assistant
Stage Manager
Performance
space to be made available to dancers 3 hours before showtime
STAGE
Dimensions :
- Procenium opening 12 m
- Depth from stage front 12
m
- Trims 6 to 7 m
Cyclo :
White
Dance floor :
Black 12m x 12 m
Wing lights : Blue
Legs : Stage right and Left to hide
side lights and maskings depending on venue
Borders :
4 borders including cyclo
LIGHTING
Projectors :
- 23 fresnels 1 Kw halogen (
Back Light )
- 2 fresnels 2 Kw (Front)
- 7 fresnels 650 w or 1 Kw (Side)
- 5 Profiles 1 Kw 614 juliat
or Source four 40° with shutters and gobo holder
- 14 Profiles 650 w or 1 kw
Juliat with shutters (Side-Lights Stage Right and Left) or Source four 40°
- 6 PARS 64 CP 62 or MFL (Back
Light)
- 12 PARS 64 CP 61 240v each
(Side)
- 3 Quartz 300 w ( les plus
petits possible)
Control board :
- 1 Lighting Board type MA Lighting
or ETC (40 chanels, 2 presets minimum)
Power :
Gélatine :
- Réf LEE FILTER :
201, 134,136,147,153, 158,180,181,106
- Réf ROSCO : 104
Set up and
focusing :
- Scaffolding or ladder
- 4 technicians (1 being familiar
with board)
VIDEO
To
be supplied by the presenting
structure
:
- 1 video projector
(if possible 3600, minimum 2400 lumens) on pedestal. 1.2 m high at stage
floor level.
Material
supplied by the video artist of the company :
- 2 D8
Cameras Sony
- 1 mini-DV
Camera
- 1 HI8
Camera (Cannon)
- 2 CameraTripods
- 2 mixingdesks
- 1
powerbook titanium G4 Macintosh
- 2 harddisks
60 and 80 giga
- Miscellaneous
cables and connectors
|
- 1 Panasonic
AVE 7
- 1 videonic
MX1
- 1 video
distributor
- 1 Video
amplifier
|
SOUND :
SPATIALISED DIFFUSION
- 10
or 8 loudspeakers are required to spatialise the sound in the following
configuration:
-
for the auditorium: 6 speakers (depending on the auditorium,
lodspeakers should be raised for optimal listening).
-
for the stage: 4 or 2 hloudspeakers of the same make and
quality with wide frequency range in the placement below.
Important : to mitigate the absence of low frequency or possible
saturation caused by inadequate loudspeakers it may be necessary to
add 2 sub-basses : onr sub-bass for the auditorium, the other for
the stage.
- 1 mixing
console with 16 tracks minimum to control all the loudspeakers
- 1 system
of stereo amplification.
- 1 CD Player
CHANGING
ROOMS
- 2 dressing
rooms (5 persons) near the stage with 5 towels, showers and mirrors
- 1 dressing
room with hangers for costumes
- 1 dressing
room for the technicians
- Catering:
tea, coffee, milk, mineral water, dried and fresh fruits, small cakes
REHEARSAL SPACE
- 3 hours of dancers rehearsal and warm on stage on performance
day.
- Cleansing of 15 pieces of costume
CLEANSING
Important cleasing to be organised
at the issue of the show, including after the general rehearsal (earth on the
stage)